Collection|Contact usWelcome,Shanghai DuanNa Enterprise Management Consulting Co., Ltd.!
Service phone021-59532958
ISO

Hot Keywords: ISO ISO9000 HACCP FACTORY

ISO/TSl6949 implementation plan

AUTHOR: http://wwww.shduanna.com.cn TIME: 2018-3-27 16:00:44

DUANNA consultant to assist supplier ISO/TSl6949 quality management system implementation plan. The whole process consulting plan is designed for the early stage of enterprise ISO/TSl6949. We adjust the implementation plan according to the customer's own needs to ensure that customers are ready for certification.
DUANNA implementation plan includes:
• gap analysis & selection of management representatives
• ISO/TSl6949 summary • implementation of procedural documents
• quality manual preparation assist internal audits
• documentation of procedures • assist in the implementation of corrective actions
• contact certification bodies • pre assessment
If you write your own documents, it will probably take up to two years. If the implementation plan of Shanghai DUANNA Enterprise Management Consulting Co. Ltd. to provide documentation, can save 80% of the time. The implementation plan includes:
- gap analysis, professional who will take DUANNA automotive suppliers and existing quality management system and ISO/TSl6949 standard comparison, confirmed nonconformance, make recommendations to ensure compliance.
• brief description of ISO/TSl6949, quality management requirements and certification requirements.
• prepare a quality management manual and establish documentation to describe the guidelines, procedures, requirements, objectives and structure of the quality management system.
• prepare procedures, documents, methods, strategies and principles for implementing the quality management system.
• liaise with certification bodies and liaise with third party certification bodies with certification quality management system to implement ISO/TSl6949 certification.
• the selection of management representatives - assist the selection of management representatives in the implementation of the quality management system and liaison with the certification authorities and the management of the company.
• implementation of process documentation - ensure that the quality management system is consistent with the ISO/TSl6949:2002 requirements.
• assist in internal audits to monitor the implementation of the quality management system to meet ISO/TSl6949:2002 standards.
• assist in the implementation of corrective actions, nonconformity in internal audits, and corrective actions as required by the quality management system.
• conduct a pre evaluation of the implementation of the quality management system for the preparation of certification audits.
ISO/TS16949 continuous improvement maintenance plan
Once ISO/TSl6949 is certified, the quality management system must be maintained. The continuous improvement plan is implemented in the most efficient and cost effective way according to the customer's needs.
Continuous improvement of maintenance plan including DUANNA:
• internal audit - an important component of the quality management system checks and balances mechanism. Major non conformities are found in the internal audits to prevent withdrawal of certification during the next audit. DUANNA can to your company a year for the two professional, effective and impartial internal audit.
Implement corrective actions after supervision and review and correct non conformance items.
• summarize preventive actions from internal audit reports and improve them.
• review, manage and make decisions to improve efficiency and effectiveness.
Continuous improvement of the maintenance plan will be removed from the DUANNA customer maintenance plan the worries, and their customers than the maintenance of the quality management system is more economical. In addition, we simplify the management review, improve the certification process, and make your company concentrate on comprehensive improvement at a more convenient speed.

 

NEWS

Training on the Clea...

1. Cleaning Validation Objectives and Regulatory Background   2. Core Definitions and Fundamental Principles   3. Cleaning Process Development (Four Elements, DHT/CHT) &nb...…
2026-9-5

Pharmaceutical GMP S...

Training Content Outline   Training Format: Approximately 32 hours of coursework + Case Studies   **Part 1: Audit Management under MAH System**   1. Audit Responsi...…
2026-9-4

FDA Audit Checklist...

Quality System and Data Integrity   Serial Number | Inspection Items and Requirements | Regulatory/Guideline Basis | Self-Inspection Results | Issue Description and Corrective Actions&n...…
2026-9-15

Purpose of FDA facto...

 Quality Management System Development and Operations: Oversee the establishment and optimization of the group headquarters' biopharmaceutical全产业链 quality management system, covering R&...…
2026-9-15

...

I. GMP Audit Regulatory Requirements  1.1 Interpretation of China’s *Regulations on Drug Inspection (Trial)*  ● **Inspection Types**:  - Licensing inspections (corresponding to *Dru...…
2026-9-15

Pharmaceutical GMP S...

I. GMP Audit Regulatory Requirements   II. Elements and Process of Self-Inspection and Audit   III. Key Points of Quality Management Assurance System Audit   IV. F...…
2026-9-11

Comparative Analysis...

I. Process Validation Regulatory Framework   Underlying Regulatory Basis   Core Principles   Phase Division   Batch Quantity Strategy   Reval...…
2026-9-11

NADCAP Certification...

思考完成(用时8秒) NADCAP Special Process Certification Guide   **I. Certification Overview**   NADCAP (National Aerospace and Defense Contractors Accreditation Program), initiated ...…
2026-8-2

Nadcap Certification...

Overview NADCAP (National Aerospace and Defense Contractors Accreditation Program) is a cooperative accreditation program jointly initiated by major U.S. aerospace and defense contractors...…
2026-8-2

What is intellectual...

What is intellectual property certification Intellectual property management system certification is to standardize intellectual property certification activities, improve its effectiv...…
2020-6-6

TEL

15000380587