Collection|Contact usWelcome,Shanghai DuanNa Enterprise Management Consulting Co., Ltd.!
Service phone021-59532958
ISO

Hot Keywords: ISO ISO9000 HACCP FACTORY

ISO17025 implementation plan

AUTHOR: http://wwww.shduanna.com.cn TIME: 2018-3-28 16:16:43
ISO/IECl7025 -- General requirements for testing and calibration laboratory capacity cabin, including all requirements of laboratory testing and calibration that must be achieved, so as to prove the quality management system of the laboratory. The standard is technically qualified and its results are indeed effective. The ISO/IECl7025 standard includes all ISO 9000 requirements related to laboratory quality management system inspection and calibration, as well as other related technical qualification requirements.
Because the ISO/IECl7025 standard includes not only the consistency with the quality management system, but also the technological capability that enables the experiment to produce effective results, the identification process of ISO/IECl7025 will be more comprehensive than the ISO 9000 certification process. If the auditor works at the same time as a certification body and certification body, and the laboratory is part of all the facilities of your company, then the authentication of ISO17025 and the certification of ISO9000, QS-9000 or ISO/TS16949 can be carried out at the same time.
The consultant will assist the laboratory in testing and calibrating the ISO/IECl7025 quality management system and technical capabilities. The full implementation plan is designed for the early stage of the implementation of the ISO/IECl7025 standard in your company. We can ensure that the certification is fully prepared according to the customer's needs.
The implementation plan includes:
• gap analysis. Selection of quality managers
• ISO/IECl7025 summary of the implementation of procedural documents
• developing quality manuals and assisting internal audits
• developing procedural documents and helping to implement corrective measures
• liaison identification agencies. Pre assessment
It takes two years for the enterprise to compile its own documents. However, with the implementation of the plan, the preparation of documents can save 80% of the time. The implementation plan includes:
The gap analysis is carried out to compare the current quality management system of the laboratory with the requirements of the ISO/IECl7025 standard, confirm the non conformance, and put forward the measures to achieve the system standard.
• the outline of ISO/IECl7025, the quality management system, the technical capability and the identification requirements.
Create a quality manual and establish documents for the guidelines, procedures, requirements, objectives and structures of the quality management system.
Preparation of procedural documents, methods, strategies and principles for the implementation of the quality management system and the maintenance of technical capabilities.
• liaison certification bodies, third party certification bodies with accredited quality management system qualification to implement ISO/IECl7025 certification.
The selection of quality managers -- assisting the selection of quality managers, implementing the daily quality management system, and liaising with the certification bodies and the company's management.
• implementation of the procedural documents - to ensure that the quality management system meets the requirements of the ISO/IECl7025.
NEWS

Training on the Clea...

1. Cleaning Validation Objectives and Regulatory Background   2. Core Definitions and Fundamental Principles   3. Cleaning Process Development (Four Elements, DHT/CHT) &nb...…
2026-9-5

Pharmaceutical GMP S...

Training Content Outline   Training Format: Approximately 32 hours of coursework + Case Studies   **Part 1: Audit Management under MAH System**   1. Audit Responsi...…
2026-9-4

FDA Audit Checklist...

Quality System and Data Integrity   Serial Number | Inspection Items and Requirements | Regulatory/Guideline Basis | Self-Inspection Results | Issue Description and Corrective Actions&n...…
2026-9-15

Purpose of FDA facto...

 Quality Management System Development and Operations: Oversee the establishment and optimization of the group headquarters' biopharmaceutical全产业链 quality management system, covering R&...…
2026-9-15

...

I. GMP Audit Regulatory Requirements  1.1 Interpretation of China’s *Regulations on Drug Inspection (Trial)*  ● **Inspection Types**:  - Licensing inspections (corresponding to *Dru...…
2026-9-15

Pharmaceutical GMP S...

I. GMP Audit Regulatory Requirements   II. Elements and Process of Self-Inspection and Audit   III. Key Points of Quality Management Assurance System Audit   IV. F...…
2026-9-11

Comparative Analysis...

I. Process Validation Regulatory Framework   Underlying Regulatory Basis   Core Principles   Phase Division   Batch Quantity Strategy   Reval...…
2026-9-11

NADCAP Certification...

思考完成(用时8秒) NADCAP Special Process Certification Guide   **I. Certification Overview**   NADCAP (National Aerospace and Defense Contractors Accreditation Program), initiated ...…
2026-8-2

Nadcap Certification...

Overview NADCAP (National Aerospace and Defense Contractors Accreditation Program) is a cooperative accreditation program jointly initiated by major U.S. aerospace and defense contractors...…
2026-8-2

What is intellectual...

What is intellectual property certification Intellectual property management system certification is to standardize intellectual property certification activities, improve its effectiv...…
2020-6-6

TEL

15000380587